Skip to content
Move. Install. Commission.

Plant & Equipment Relocation, Reinstallation

De-installation, shifting, erection, and commissioning of plant and machinery — executed by rigging crews, millwrights, and electricians under experienced project supervision.

5+
Years of Excellence
200+
Projects Delivered
1000+
Personnel Deployed
24/7
Site Coverage

Plant Relocation & Installation

Moving a production line is a precision project: one misaligned machine or damaged cable tray can cost weeks. ISOCHEN SAFETY executes machinery relocation end to end — documentation and tagging, safe de-installation, packing and shifting support, foundation and erection, alignment, re-cabling, and commissioning support until the line runs again.

Our multi-trade crews (riggers, millwright fitters, electricians, instrumentation technicians) work under a single project supervisor with a defined schedule, method statements, and daily progress reporting — for single machines or complete plant moves.

De-Installation

Systematic disconnection, tagging, and documentation of mechanical, electrical, and utility connections.

Rigging & Shifting

Trained rigging crews for safe lifting, loading, and positioning of machinery and equipment.

Erection & Alignment

Foundation checks, machine levelling, laser/dial alignment, and grouting to OEM tolerances.

Electrical Reconnection

Power distribution, cabling, panel installation, and termination by licensed electricians.

Utility Hook-Ups

Compressed air, chilled water, and process piping reconnection with pressure testing.

Commissioning Support

Trial runs, snag rectification, and support until stable production handover.

How a Relocation Project Runs

1. Survey and documentation

A site visit at both ends, a machine list with weights and dimensions, photos and tags on every connection, and a method statement and lift plan for each move.

2. De-installation and packing

Isolation and draining, disconnection of mechanical, electrical and utility lines, protection of sensitive parts, and packing support before the machine leaves the floor.

3. Shifting and erection

Loading, transport coordination, placing on the new foundation, levelling, alignment to the manufacturer's tolerances, and grouting.

4. Reconnection and commissioning

Electrical and utility reconnection, pressure tests, trial runs and a snag list, closed with a handover file of alignment readings and test records.

What We Move and Install

Relocation work ranges from a single machine to a full production line. Typical scope includes:

  • CNC machines, presses and other production machinery
  • Assembly and conveyor lines, re-laid to a new floor plan
  • Compressors, chillers, pumps and other utility equipment
  • Control panels, cabling and cable trays
  • Compressed air, chilled water and process piping between machines
  • Re-layouts inside the same factory as well as moves between sites

What to Send Us for a Quote

A survey visit fixes the final plan, but these details let us size the job and propose a schedule from the first message:

  • Machine list with approximate weights and dimensions
  • From and to locations, and the access at each end
  • Whether foundations and floor at the new site are ready
  • The downtime window you can allow
  • Whether cranes and transport are in our scope or arranged by you

Why Choose ISOCHEN SAFETY?

  • Single project owner: One supervisor accountable for schedule, safety, and quality across all trades.
  • Method-statement driven: Every lift and reconnection planned and documented before execution.
  • OEM-tolerance alignment: Millwrights align to manufacturer specifications with recorded readings.
  • Insurance & compliance: Insured workforce with full PF/ESI compliance for the project duration.
  • India-wide: Relocations executed between industrial clusters Pan-India.

Frequently Asked Questions

Do you handle complete factory relocations or only single machines?

Both — from relocating a single CNC machine to shifting complete production lines and utility equipment between sites.

Who provides cranes and transport?

We can work with your appointed crane/transport vendors or arrange them as part of our scope — defined clearly in the project plan.

How is machine alignment quality assured?

Millwright fitters align to OEM tolerances using laser or dial methods, with alignment readings recorded and submitted in the handover dossier.

Do you support commissioning after installation?

Yes — trial runs, snag lists, and rectification support until the equipment reaches stable production, including operator handover.

How long does a plant relocation take?

It depends on the number and size of machines, the distance and how ready the new site is. We give a day-by-day schedule after the survey visit.

Do you prepare the foundations at the new site?

Foundation civil work is usually done by your civil contractor. Before placing machines we check foundation levels, bolt positions and readiness against the machine drawings.

Who covers insurance while machines are in transit?

Transit insurance sits with whoever arranges the transport. This is set out in the project plan before the move.

Can you re-layout machines inside the same factory?

Yes. Internal re-layouts follow the same steps: survey, de-installation, shifting, alignment, reconnection and trial runs.

Explore related services: Shutdown Maintenance  ·  MEP Services  ·  Production Equipment Maintenance

Related reading: Plant shutdown contractor  ·  HVAC AMC checklist  ·  IBR boiler certification guide

Technicians, welders and riggers: join our talent pool.

Hiring is paused right now. Send your CV on WhatsApp and we will contact you when roles reopen. We never charge candidates a fee.

Join the Talent Pool →

Let's Talk About Your Plant

Tell us your requirement — our team responds with a tailored proposal within 24 hours.

Part of the Vasundhara Group: Vasundhara Performance Solutions  |  Vasundhara Specialities  |  About the group